ISOTRON
  • ES
  • EN
  • FR

Navigation

  • ISOTRON
  • Company
  • The group
  • News
  • Where we are
  • Contact
  • Blog
  • Jobs
  • Corporate catalogs

Activities

  • Automation
  • BOP / BOS
  • Electricity and instrumentation
  • EPC / Turnkey
  • Engineering
  • Lines
  • Maintenance
  • Substations

Project types

  • Fossil-fuel power stations
  • Cogeneration / Biomass
  • Photovoltaics Power Plants
  • Industrial facilities
  • Oil & Gas
  • Wind farms
  • Transmission and distribution of energy
  • Industrial wastewater treatment plant

cogeneration/biomass

fossil-fuel power stations

industrial facilities

industrial wastewater treatment plant

oil & gas

photovoltaics power plants

transmission and distribution

wind farms

fossil-fuel power stations

ciclos combinados <br/>y centrales de carbón

Automation

Control system at hydropower plants - Spain

Control system at hydropower plants

Client: ENDESA
Location: Spain

Updating throughout the years of the control systems of several hydropower plants and installing S7-400 programmable automation, SIEMENS SCADA WinCC and PROFIBUS networked remote control system. Plants covered by the works: EUME, PRADA, SAN SEBASTIAN, BARCENA, LAS ONDINAS, CORNATEL, QUEREÑO.

Electricity and instrumentation

Central Ciclo Combinado Lituanian Power Plant - Lithuania

Client: IBERDROLA
Location: Lithuania

Montaje eléctrico e instrumentación del B.O.P I con las siguientes cifras principales: 119.500 horas directas. 13.000 horas indirectas. Montaje de transformador de potencia de 230/380 MVA. Montaje de ISOPHASE BUSBAR. Tendido y conexionado de 190.000 metros de cable. Montaje de 9000 metros de canalizaciones (bandeja y conduit). Montaje calibración y puesta en marcha de más de 440 instrumentos.

Electricidad e instrumentación Central Ciclo Combinado Koudiet - Algerie

Client: IBERDROLA/SONELGAZ
Location: Algerie

Montaje eléctrico del Grupo 3 y montaje de instrumentación de los Grupos 1,2,3 y comunes, con las siguientes cifras principales: 193.00 horas directas. 66.000 horas indirectas. Tendido y conexionado de 240.000 metros de cable. Montaje de 13.500 metros de canalizaciones (bandeja y conduit). Montaje calibración y puesta en marcha de más de 3.000 instrumentos.

Montoir combined cycle plant - France

Montoir combined cycle plant

Client: TECNICAS REUNIDAS
Location: France

Electrical and instrumentation facilities for Gaz de France's Montoir combined cycle plant.

Central Ciclo Combinado de Riga (1x400 MW) - Latvia

Client: IBERDROLA INGENIERIA Y CONSTRUCCION
Location: Latvia

Trabajos de montaje eléctrico, montaje de bandeja, tendido y conexionado de cables. Soporte a Puesta en Marcha.

Substation at Tierra Amarilla simple cycle power plant - Chile

Substation at Tierra Amarilla simple cycle power plant

Client: DURO FELGUERA
Location: Chile

Turnkey construction project including engineering, supply, assembly and start-up of the 220kV substation.

Andina thermal electric power plant - Chile

Andina thermal electric power plant

Client: COBRA PLANTAS INDUSTRIALES
Location: Chile

Assembly and start-up of electrical and instrumentation facilities and the design, supply and assembly of the lighting facility for Units I and II in Mejillones.

Dock Sud combined cycle power plant - Argentina

Dock Sud combined cycle power plant

Client: UTE BABCOCK WILCOX/ABB ALSTOM POWER
Location: Argentina

Assembly of electrical facilities and instrumentation.

Engineering

Start-up of the Pasajes de San Juan power plant - Spain

Client: IBERDROLA
Location: Spain

Hardware and software review, including compliance with the NFPA 85:2004 ‚ "Boiler and Combustion Systems Hazards Code". Review of testing protocols. FAT and SAT tests and hot tests

Maintenance

Revisión central térmica Narcea - Spain

Client: UNION FENOSA GENERACION
Location: Spain

Revisión eléctrica de alta tensión y baja tensión de la central térmica de Narcea durante la parada 2009.

Revisión general de la central térmica Aboño-1 - Spain

Client: HIDROELECTRICA DEL CANTABRICO
Location: Spain

Revisión general eléctrica del Grupo 1 en la central térmica de Aboño.

Pie de página

Más información

  • Disclaimer
  • Privacy Policy
  • Cookies Policy

Créditos

2013 - 2020 © ISASTUR
Diseño + Desarrollo: Bittia

Síguenos