ISASTUR
  • ES
  • EN
  • FR

Navigation

  • ISASTUR
  • The group
  • Companies
  • News
  • Where we are
  • Contact
  • Blog
  • Jobs
  • Corporate catalogs

Sectors

  • Water
  • Automotive
  • Energy
  • Mining
  • Naval
  • Petrochemical
  • Chemical
  • Renewable
  • Siderurgy / Metallurgy

Activities

  • Electricity and instrumentation
  • EPC / Turnkey
  • Facility Management
  • Engineering
  • Lines
  • Maintenance
  • Mechanical Assembly
  • Substations

electricity and instrumentation

engineering

EPC / turnkey

facility management

lines

maintenance

mechanical assembly

substations

ingeniería

Energy

Palos 400/220 kV substation - Spain

Palos 400/220 kV substation Palos 400/220 kV substation

Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain

Comprehensive engineering works for the construction of the Palos 400 kV substation, with exterior, ring-configured armoured modules with two bays, three combined-cycle group terminals and one 400/220 kV autotransformer. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Jordana 400/220 kV substation - Spain

Jordana 400/220 kV substation

Client: SIEMENS
Location: Spain

Comprehensive engineering works for the construction of the Jordana 400/220 kV substation. With a 400 kV compound, with exterior, ring-configured armoured modules with two bays and one 400/220 kV autotransformer. And a 220 kV compound, with interior, double busbar-configured armoured modules with seven bays, one autotransformer bay and coupling. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Fuendetodos 400 kV substation - Spain

Fuendetodos 400 kV substation

Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain

Comprehensive engineering works for the construction of the Fuendetodos 400 kV substation, with exterior, ring-configured armoured modules, two bays and one autotransformer. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Sant Adriá de Besós 220/66/25 kV substation - Spain

Sant Adriá de Besós 220/66/25 kV substation

Client: ENDESA DISTRIBUCION ELECTRICA, S.A.
Location: Spain

Comprehensive engineering works for the construction of the Sant Adriá de Besós 220 kV substation, with interior, double busbar-configured armoured modules with five bays and four transformer bays, three group bays, two longitudinal coupling bays and one cross coupling. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Puerto de la Cruz 400 kV substation - Spain

Puerto de la Cruz 400 kV substation

Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain

Comprehensive engineering works for the construction of the Puerto de la Cruz 400 kV substation, with conventional switchgear, an interrupter and half configuration made up of four lanes, including two reactor bays and one 400/220 kV autotransformer. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Morvedre 400kV substation - Spain

Morvedre 400kV substation

Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain

Comprehensive engineering works for the construction of the Morvedre 400 kV substation, with exterior, double busbar ring-configured armoured modules with two bays, three combined-cycle group terminals and one 400/220 kV autotransformer and two bays to the converter station (connection cable with the Balearic Islands). Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Asset Integration Project - Spain

Asset Integration Project

Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain

Comprehensive engineering works, including documentation on the tender and subsequent construction of the facilities, for more than 50 facilities across Spain as part of REE's asset integration project. Including both the documentation on the structure and assembly of switchgear to be refurbished and the engineering to remodel the control, protection and remote control equipment. Partial technical assistance in critical phases.

Puentes 400 kV substation - Spain

Puentes 400 kV substation

Client: SIEMENS
Location: Spain

Comprehensive engineering works for the construction of the Puentes 400 kV substation, with interior, double busbar-configured technology made up by three group terminals and one coupling. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Galapagar 220 kV substation - Spain

Galapagar 220 kV substation

Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain

Comprehensive engineering works for the construction of the Galapagar 220 kV substation, with conventional switchgear, double busbar configuration, two bays, one coupling bay and two transformer bays. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Subestaciones San Gil y Peña II 30/132 kV - Spain

Client: ENEL UNION FENOSA RENOVABLES
Location: Spain

Diseño del esquema protectivo, Ajuste de selectividades, Pruebas de Protecciones, Pruebas Funcionales y Asistencia a las Puestas en Servicio de las subestaciones eléctricas de SAN GIL y PEñA II 30/132 kV.

Paper

ENCE 220 kV substation - Spain

ENCE 220 kV substation

Client: SIEMENS
Location: Spain

Comprehensive engineering works for the construction of the ENCE 220 kV substation, with conventional switchgear, ring configuration, one bay and two autotransformer bays. Included in the works performed as the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Renewable

Begega 132/20 kV substation - Spain

Begega 132/20 kV substation

Client: EDP RENOVAVEIS, S.A.
Location: Spain

Comprehensive engineering works for the construction of the Begega substation, with SF6-insulated interior switchgear, simple busbar configuration, one bay and one transformer bay. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.

Trévago 220/66/30 kV substation - Spain

Trévago 220/66/30 kV substation

Client: ENDESA RENOVABLES Y DANTA ENERGIA
Location: Spain

Comprehensive engineering works for the construction of the Trévago substation, with conventional switchgear, double busbar configuration, two (2) bays, one (1) coupling bay and two (2) transformer bays. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and the construction of the substation, as part of the end client's order to the Isastur Group.

Subestación Villameca 132/400 kV - Spain

Client: PROMOCIONES ENERGETICAS DEL BIERZO
Location: Spain

Diseño del esquema protectivo, Ajuste de selectividades, Pruebas de Protecciones, Pruebas Funcionales y Asistencia a la Puesta en Servicio de la subestación eléctrica de VILLAMECA 132/400 kV.

Pie de página

Más información

  • Disclaimer
  • Privacy Policy
  • Cookies Policy

Créditos

2013 - 2025 © ISASTUR
Diseño + Desarrollo: Bittia

Síguenos